Product Data

Bill of Materials

What a bill of materials is, how single-level and multi-level BOMs differ, engineering versus manufacturing BOMs, and the structure decisions that affect planning.

The bill of materials is the structured definition of what goes into a product. Planning, costing, purchasing and traceability all inherit its errors.

Single-level and multi-level

A single-level BOM lists the immediate components of one item. A multi-level BOM shows the full tree down to purchased parts. MRP explodes level by level, so intermediate levels should exist where you actually stock or plan a subassembly — not simply because engineering drew it that way.

Engineering versus manufacturing BOM

The engineering BOM describes the product as designed. The manufacturing BOM describes it as built: phantom assemblies, consumables, packaging, scrap factors and the sequence the floor actually follows. Small manufacturers frequently try to plan from an engineering BOM and struggle.

Structure decisions that matter

  • Where to stock subassemblies versus flatten them.
  • Whether to use phantoms for transient assemblies.
  • Scrap and yield factors at the right level.
  • Consistent units of measure and conversion.
  • Effectivity and revision control.

Not sure what your operation actually needs?

Answer a short set of questions about your manufacturing requirements and request a systems review.

Start the assessment